風(fēng)管及管道部件設(shè)計(jì)過程中常用的計(jì)算方法

發(fā)布人:http://www.hkcts.com.cn   發(fā)布時(shí)間:2024-01-16 11:27:39

風(fēng)管安裝按施工圖示不同規(guī)格以展開“面積”計(jì)算,不扣除檢查孔、測(cè)定孔、送風(fēng)口、吸風(fēng)口等所占面積。計(jì)算風(fēng)管長(zhǎng)度時(shí),一律以施工圖示中心線長(zhǎng)度為準(zhǔn)(主管與支管以其中心線交點(diǎn)劃分),包括彎頭、三通、變徑管、天圓地方等管件的長(zhǎng)度,但不得包括帆布、風(fēng)閥、消聲器、設(shè)備所占長(zhǎng)度。直徑和周長(zhǎng)按圖示尺寸為準(zhǔn)展開。報(bào)價(jià)時(shí)定額已含損耗,計(jì)算結(jié)果不需要乘損耗系數(shù)。

The installation of air ducts shall be calculated based on different specifications as shown in the construction drawings, without deducting the area occupied by inspection holes, measuring holes, air supply outlets, suction outlets, etc. When calculating the length of the air duct, the length of the centerline on the construction drawing shall be used as the standard (the main pipe and branch pipe shall be divided by the intersection point of the centerline), including the length of fittings such as elbows, tees, variable diameter pipes, and skylines, but shall not include the length occupied by canvas, air valves, silencers, and equipment. The diameter and circumference shall be unfolded according to the dimensions shown in the diagram. When quoting, the quota already includes losses, and the calculation results do not need to be multiplied by the loss coefficient.

薄鋼板通風(fēng)管道、凈化通風(fēng)管道,復(fù)合型風(fēng)管(玻纖板、不燃無機(jī)復(fù)合風(fēng)管),報(bào)價(jià)定額內(nèi)已包括法蘭、加固框和吊托支架,不另行計(jì)算。但不包括過跨風(fēng)管落地支架,因此過跨風(fēng)管落地支架需按圖按規(guī)范計(jì)算重量。

Thin steel plate ventilation ducts, purification ventilation ducts, composite air ducts (fiberglass board, non combustible inorganic composite air ducts), the quotation quota already includes flanges, reinforcement frames, and suspension brackets, and will not be calculated separately. However, it does not include the ground support for cross span air ducts, so the weight of the ground support for cross span air ducts needs to be calculated according to the drawings and specifications.

不銹鋼通風(fēng)管道、鋁板通風(fēng)管道,風(fēng)管咬口連接中報(bào)價(jià)定額包括管件、法蘭,但不包括吊托支架,焊接連接中報(bào)價(jià)定額僅包括管件,不包括法蘭和吊托支架,其工程量以“kg”為計(jì)量單位,故根據(jù)風(fēng)管連接方式按設(shè)計(jì)說明或規(guī)范計(jì)算法蘭和吊托支架重量。

20170718460612.png

The quotation quota for stainless steel ventilation ducts, aluminum plate ventilation ducts, and air duct bite connections includes fittings and flanges, but does not include suspension brackets. The quotation quota for welded connections only includes fittings, but does not include flanges and suspension brackets. The quantity of work is measured in kilograms. Therefore, the weight of flanges and suspension brackets is calculated according to the design instructions or specifications based on the air duct connection method.

(參考已施工項(xiàng)目結(jié)算數(shù)據(jù):法蘭(不銹鋼角鐵3#)的含量測(cè)算0.9kg/m2;吊托支架(不銹鋼角鐵4#、不銹鋼槽鋼6#)含量測(cè)算1.5kg/m2;若其他項(xiàng)目有類似工程請(qǐng)及時(shí)提供數(shù)據(jù)及時(shí)更正。)

(Referring to the settlement data of the constructed project: the content of flange (stainless steel angle iron 3 #) is calculated to be 0.9kg/m2; The content of the suspension bracket (stainless steel angle iron 4 #, stainless steel channel steel 6 #) is calculated to be 1.5kg/m2; If other projects have similar projects, please provide data in a timely manner for timely correction

風(fēng)管軟接:

Flexible connection of air ducts:

(1)帆布接口,按圖示尺寸以“”計(jì)算,一般寬度為250mm,具體以現(xiàn)場(chǎng)制作經(jīng)驗(yàn)考慮;

(1) Canvas interface, calculated in square meters according to the dimensions shown in the diagram, with a general width of 250mm, specific considerations based on on-site production experience;

(2)軟管風(fēng)管,按圖紙尺寸以“米”計(jì)算。

(2) Flexible hose duct, calculated in meters according to the dimensions on the drawing.

風(fēng)管導(dǎo)流葉片,按風(fēng)管規(guī)格計(jì)算彎頭個(gè)數(shù),按下表計(jì)算導(dǎo)流葉片“面積”。

Calculate the number of bends according to the specifications of the air duct, and calculate the "area" of the guide vanes according to the table below.

風(fēng)口風(fēng)閥,按不同類型(防火閥、蝶閥、對(duì)開多葉閥、散流器、百葉等)不同規(guī)格以“個(gè)”為計(jì)量單位(按成品計(jì)算)。

The air vent valve is measured in units of "pieces" according to different types (fire dampers, butterfly valves, split multi leaf valves, diffusers, louvers, etc.) and specifications (calculated as finished products).

消聲器、消聲靜壓箱、靜壓箱,按不同規(guī)格以“臺(tái)”為計(jì)量單位(按成品計(jì)算),除設(shè)計(jì)要求現(xiàn)場(chǎng)制作時(shí)以“”(展開六個(gè)面面積)計(jì)算。

Silencers, silencing static pressure boxes, and static pressure boxes shall be measured in units of "units" according to different specifications (calculated as finished products), and shall be calculated in "square meters" (expanding the six surface areas) unless required by the design for on-site production.

防蟲網(wǎng)以“個(gè)”計(jì)算或者以“”計(jì)算,組價(jià)人員可根據(jù)需要自行換算。

Insect proof nets are calculated in units or square meters, and pricing personnel can convert them according to their needs.

設(shè)計(jì)說明有需要風(fēng)管檢查孔與風(fēng)管測(cè)定孔的,檢查孔按下表換算,以重量計(jì)算,測(cè)定孔按其型號(hào)以“個(gè)”為計(jì)量單位。

If there is a need for air duct inspection holes and air duct measurement holes in the design specifications, the inspection holes shall be converted according to the table below, calculated by weight, and the measurement holes shall be measured in "pieces" according to their model.

過墻套管采用2mm厚鋼板或其他厚度時(shí)(按設(shè)計(jì)圖紙)以“面積”計(jì)算。

When the wall sleeve is made of 2mm thick steel plate or other thicknesses (according to the design drawings), it is calculated as "area".

本文來自:濟(jì)南通風(fēng)管道更多的內(nèi)容請(qǐng)點(diǎn)擊:http://www.hkcts.com.cn我們將會(huì)為您提問的問題提供一個(gè)滿意的服務(wù),歡迎您的來。

This article is from: Jinan Ventilation Pipeline. For more information, please click: http://www.hkcts.com.cn We will provide a satisfactory service for the questions you ask, and welcome you to come.