  空調(diào)通風(fēng)管道內(nèi),在長期運(yùn)用中,會(huì)積聚大量的灰塵,不但會(huì)嚴(yán)重污染室內(nèi)的空氣,而且會(huì)增加風(fēng)管系統(tǒng)阻力,使空調(diào)系統(tǒng)的風(fēng)量降落。更重要的是,風(fēng)管內(nèi)空氣的溫度和濕度十分適合有害細(xì)菌的生長和繁衍,直接成為一個(gè)隱秘的污染源。

  In the ventilation duct of central air conditioning, a large amount of dust will accumulate in the long-term use, which will not only seriously pollute the indoor air, but also increase the resistance of the air duct system, and make the air volume of central air conditioning system fall. More importantly, the air temperature and humidity in the air duct are very suitable for the growth and reproduction of harmful bacteria, which directly becomes a hidden source of pollution.

  集中式通風(fēng)管道除塵、清洗和流程

  Centralized ventilation pipe dedusting, cleaning and disinfection process

  一、清洗前的準(zhǔn)備

  1、 Preparation before cleaning

  1.1、依據(jù)裝置圖紙和所要施工的現(xiàn)場理解新風(fēng)管、回風(fēng)管、送風(fēng)管系統(tǒng)的規(guī)劃;

  1.1. Understand the planning of fresh air duct, return air duct and air supply duct system according to the device drawings and the construction site;

  1.2、以風(fēng)管系統(tǒng)為單位除塵、清洗和;

  1.2. Take the air duct system as the unit for dust removal, cleaning and disinfection;

  1.3、選定清洗口和吸塵口,如運(yùn)用第六代管道機(jī)器人,在選擇清洗口口,對清洗單元的末端停止封鎖,清洗和收塵同時(shí)在清洗完成;

  1.3. Select the cleaning port and dust suction port. If the sixth generation pipeline robot is used, stop blocking the end of the cleaning unit when selecting the cleaning port. The cleaning and dust collection are completed at the same time;

20170426071231944.jpg

  1.4、運(yùn)用通風(fēng)管監(jiān)視監(jiān)控系統(tǒng)檢查管道內(nèi)污染水平、管道構(gòu)造內(nèi)特性,分離通風(fēng)管道的尺寸和間隔空中的高度,選擇適宜的清洗設(shè)備(管道機(jī)器人、軟軸)。

  1.4 use the ventilation pipe monitoring and control system to check the pollution level in the pipe and the characteristics in the pipe structure, separate the size of the ventilation pipe and the height in the air, and select the appropriate cleaning equipment (pipe robot, flexible shaft).

  1.5、清洗設(shè)備及工具運(yùn)輸?shù)街付ǖ攸c(diǎn),并用氈布遮蓋好施工地點(diǎn)下方的物品,電工開端接 通臨 時(shí)電源,經(jīng)過之前肯定的清洗口,對風(fēng)管停止清洗作業(yè)。

  1.5. The cleaning equipment and tools shall be transported to the designated place, and the items under the construction site shall be covered with felt cloth. The electrician shall start to connect the temporary power supply, and stop the cleaning operation of the air duct after passing through the previously confirmed cleaning port.

  二、清洗工作的注意事項(xiàng)

  2、 Precautions for cleaning

  2.1、清洗該操作段的防火閥,如清洗不到的應(yīng)在防火閥一側(cè)啟齒清洗,清洗完成后封鎖切口,恢復(fù)保溫。

  2.1. Clean the fire damper of the operation section. If the fire damper cannot be cleaned, it shall be cleaned at one side of the fire damper. After cleaning, seal the incision and restore the heat preservation.

  2.2、錄像監(jiān)視系統(tǒng)對空調(diào)風(fēng)管清洗前、中、后停止監(jiān)測及錄像,保管圖片。

  2.2 the video monitoring system shall stop monitoring and video recording before, during and after cleaning the air duct of the central air conditioner, and keep the pictures.

  2.3、拆掉吸氣管和吸管盤,恢復(fù)清洗、過的風(fēng)口,用預(yù)先準(zhǔn)備好的原系統(tǒng)同種資料,用鉚釘槍封鎖風(fēng)口,并用密封膠將縫隙密封,且恢復(fù)保溫資料。

  2.3. Remove the suction pipe and suction plate, recover the cleaned and sterilized air outlet, use the same data of the original system prepared in advance, use the rivet gun to block the air outlet, seal the gap with sealant, and recover the heat preservation data.

  2.4、檢查風(fēng)管吊頂?shù)膹?qiáng)度,如強(qiáng)度不夠應(yīng)在頂棚打收縮螺栓,用預(yù)制的角鋼托盤停止加固,以不影響風(fēng)管強(qiáng)度為準(zhǔn)繩,嚴(yán)厲按規(guī)范操作。風(fēng)口及過濾網(wǎng)撤除后到指定地點(diǎn)用高壓水槍停止清洗。

  2.4 check the strength of the ceiling of the air duct. If the strength is not enough, the shrinkage bolt shall be made on the ceiling, and the prefabricated angle steel tray shall be used to stop the reinforcement, so as not to affect the strength of the air duct, and the operation shall be strictly in accordance with the specifications. Remove the tuyere and filter screen and stop cleaning with high-pressure water gun at the designated place.

  2.5、風(fēng)機(jī)盤管清洗。

  2.5. Fan coil cleaning.

  2.6、清洗工作完成后,由甲方單位停止驗(yàn)收,并在竣工報(bào)告和驗(yàn)收報(bào)告上簽字。

  2.6 after cleaning, Party A shall stop acceptance and sign the completion report and acceptance report.

  三、掃尾工作

  3、 Finishing work

  3.1、施工中所產(chǎn)生的的渣滓全部密封,竣工分開施工現(xiàn)場時(shí),裝車帶走;

  3.1. All the dregs generated in the construction shall be sealed. When the completion is separated from the construction site, they shall be loaded and taken away;

  3.2、施工中接的暫時(shí)電源、現(xiàn)場戒備標(biāo)識(shí)或圍擋停止及時(shí)回復(fù)施工前原貌,避免給甲方單位帶來不便和形成損失

  3.2. The temporary power supply, on-site alert sign or enclosure connected during the construction shall be restored to the original appearance before the construction to avoid inconvenience and loss to Party A

  以上是對通風(fēng)管道怎么清理的詳細(xì)過程,希望對你們有所幫助,本文由濟(jì)南通風(fēng)管道友情分享,想要了解更多歡迎網(wǎng)站http://www.hkcts.com.cn留言。

  The above is the detailed process of how to clean and disinfect the ventilation pipe. I hope it can help you. This article is shared by Jinan ventilation pipe company. If you want to know more, welcome to our website http://www.hkcts.com.cn Leaving a message.