濟南通風管道合口連接的六大注意事項?

發(fā)布人:http://www.hkcts.com.cn   發(fā)布時間:2020-07-20 17:33:13

  濟南通風管道的合口連接是否成功是整個通風管道系統(tǒng)安裝成功的關(guān)鍵。如果濟南通風管道的于合口連接不合格,管道系統(tǒng)在使用過程中會發(fā)生泄漏。因此,在進行通風管道的連接時,需要注意以下注意事項。

  Whether the joint connection of Jinan ventilation pipe is successful is the key to the successful installation of the whole ventilation pipeline system. If the joint connection of Jinan ventilation pipeline is unqualified, the pipeline system will leak in the process of use. Therefore, the following precautions should be paid attention to when connecting the ventilation pipe.

  1.對于矩形風管的直管段,無論是用同一塊板連接還是用幾塊板拼接,表面應(yīng)光滑,角線應(yīng)平直。組裝前,應(yīng)板材切割面上的切割粉末、灰塵和雜物。

  1. For the straight section of rectangular air duct, whether connected with the same plate or spliced with several plates, the surface should be smooth and the corner line should be straight. Before assembly, the cutting surface of the plate should be cleaned of cutting powder, dust and debris.

  2.管段組合后,外部接頭應(yīng)修整45度,板的外表面應(yīng)用鋁箔帶密封。每邊寬度不小于20毫米,用角尺和鋼帶檢查并調(diào)整垂直度和角線,偏差,符合規(guī)范要求。

  2. After the combination of pipe sections, the external joint should be trimmed to 45 degrees, and the outer surface of the plate should be sealed with aluminum foil. The width of each side shall not be less than 20 mm. The perpendicularity and angle line shall be checked and adjusted with angle ruler and steel strip, and the deviation shall meet the specification requirements.

                                       QQ截圖20170428145504.png

  3.風管的圓弧面或折線面下料彎曲完成后,應(yīng)與平板預組裝,然后涂上膠粘劑,以保證管件的幾何形狀、尺寸和壓痕。

  3. After the arc surface or broken line surface of the air duct is cut and bent, it should be pre assembled with the flat plate, and then coated with adhesive to ensure the geometric shape, size and indentation of the pipe fitting.

  4.連接和組合后的管段應(yīng)垂直放置,直到它們在移動前成型。

  4. The connected and assembled pipe sections shall be placed vertically until they are formed before moving.

  5.鋁箔復合保溫管用膠粘劑應(yīng)為板材制造商認可的專用膠粘劑。如果單獨購買粘合劑,需要進行連接效果對比測試,并且粘合劑要經(jīng)過監(jiān)理和板制造商的檢查和批準后才能使用。

  5. The adhesive for aluminum foil composite insulation pipe shall be the special adhesive approved by the plate manufacturer. If the brand adhesive is purchased separately, the bonding effect comparison test shall be conducted, and the adhesive shall be inspected and approved by the supervisor and the plate manufacturer before use.

  6.粘接前需要進行預組裝,檢查接縫是否全部吻合并正確涂刷膠粘劑,粘接時間控制及季節(jié)、溫度和粘接性能。在批量處理之前,應(yīng)進行樣品測試,以確定粘合時間。

  6. Pre assembly shall be carried out before bonding. Check whether the joints are fully bonded and properly coated with adhesive, control of bonding time, season, temperature and bonding performance. Prior to batch processing, sample testing should be performed to determine bonding time.

  因此,在濟南通風管道的合口連接完成后,要注意對通風管道接頭連接的詳細檢查和檢查,以確保通風管道的接頭連接是否嚴密。以上是小編給大家的內(nèi)容分享。我們在進行通風管道合口連接時,一定要注意以上幾點,希望能對你有所幫助,想要了解更多相關(guān)內(nèi)容歡迎點擊我們的網(wǎng)站http://www.hkcts.com.cn首頁。

  Therefore, after the joint connection of the ventilation pipe in Jinan is completed, it is necessary to pay attention to the detailed inspection and inspection of the joint connection of the ventilation pipe, so as to ensure that the joint connection of the ventilation pipe is tight. The above is a small part of the content to share. We must pay attention to the above points when we connect the ventilation pipes. We hope it can help you. If you want to know more about it, please click on the home page of our official http://www.hkcts.com.cn  website.