国产精品自在欧美一区,天堂av影视,国语精品一区二区三区,色欲av少妇av

當(dāng)前位置:首頁-新聞中心新聞中心

通風(fēng)管道設(shè)備安裝工程量怎么計(jì)算

發(fā)布人:http://www.hkcts.com.cn   發(fā)布時(shí)間:2022-08-10 18:00:10

通風(fēng)管道設(shè)備安裝工程量怎么計(jì)算:

How to calculate the installation quantities of ventilation duct equipment:

1、金屬空調(diào)器殼體、濾水器、溢水盤 按施工圖要求,查標(biāo)準(zhǔn)圖或《通風(fēng)空調(diào)工程》定額附錄一計(jì)算質(zhì)量,非標(biāo)準(zhǔn)部件按成品質(zhì)量計(jì)算。

1. The metal air conditioner shell, water filter and overflow tray shall be calculated according to the requirements of the construction drawing, and the quality shall be calculated according to the standard drawing or the quota Appendix I of ventilation and air conditioning engineering. The non-standard parts shall be calculated according to the quality of finished products.

2、鋼擋水板按空調(diào)器端面面積計(jì)算工程量 以“”計(jì)量,計(jì)算式如下: 擋水板面積=空調(diào)器斷面積×擋水板張數(shù)或擋水板面積=A× B×張數(shù),鋼擋水板制作安裝以曲折數(shù)(3折\6折)和板距分檔次,套用相應(yīng)子目。玻璃擋板,使用鋼板擋水板相應(yīng)子目,其材料、機(jī)械均乘以系數(shù)0.45,人工不變。

2. The steel water baffle is calculated according to the end surface area of the air conditioner. The quantities are measured in square meters. The calculation formula is as follows: water baffle area = sectional area of the air conditioner × Number of baffle plates or area of baffle plate = a ×  B × The number of sheets, the fabrication and installation of steel water retaining plate shall be graded according to the number of twists (3-fold \ 6-fold) and the plate distance, and the corresponding sub items shall be applied. For the glass baffle, the corresponding sub items of steel plate water baffle are used. The material and machinery are multiplied by the coefficient of 0.45, and the labor is unchanged.

QQ截圖20170428145354.png

3、鋼密閉門以帶視孔和不帶視孔分檔 分別以個(gè)計(jì)量,套用相應(yīng)子目。

3. The steel closed door shall be measured in pieces with and without sight holes, and the corresponding sub items shall be applied.

4、設(shè)備支架 按施工圖要求以質(zhì)量計(jì)算。

4. The equipment support shall be calculated by mass according to the requirements of the construction drawing.

5、清洗槽、浸油槽、晾干架、LWP濾塵器支架的制作安裝 按質(zhì)量計(jì)算工程量,用設(shè)備支架子目。

5. The fabrication and installation of cleaning tank, oil soaking tank, drying rack and LWP dust filter support shall be calculated according to the quality, and the equipment support sub items shall be used.

關(guān)于通風(fēng)管道是什么呢,以及通風(fēng)管道設(shè)備安裝工程量怎么計(jì)算的相關(guān)內(nèi)容,這里就為大家分享這么多了。相信通過之前的講解之后,大家對于通風(fēng)管道的概念以及通風(fēng)管道設(shè)備安裝工程量計(jì)算,都已經(jīng)比較熟悉和了解了,所以今天就不再重復(fù)說明了。不過,如果大家對通風(fēng)管道的知識,還有什么疑問的話,歡迎大家前來重慶科新通風(fēng)咨詢關(guān)于通風(fēng)管道的問題。

What is the ventilation duct and how to calculate the installation quantities of the ventilation duct equipment, so much is shared here. I believe that after the previous explanation, we have been familiar with the concept of ventilation duct and the calculation of the quantities of ventilation duct equipment installation, so we will not repeat the explanation today. However, if you have any questions about the knowledge of ventilation ducts, you are welcome to come to Chongqing Kexin ventilation Co., Ltd. to consult about the ventilation ducts.

以上就是為大家介紹的有關(guān)濟(jì)南通風(fēng)管道的詳細(xì)的介紹,希望對您有所幫助.如果您有什么疑問的話,歡迎聯(lián)系我們.我們將以的態(tài)度,為您提供服務(wù)http://www.hkcts.com.cn

The above is the detailed introduction of Jinan ventilation duct. I hope it will help you. If you have any questions, please contact us. We will provide you with services with a professional attitude http://www.hkcts.com.cn


上一篇:鍍鋅鐵皮風(fēng)管有什么特點(diǎn)
下一篇:玻璃鋼通風(fēng)管道的特點(diǎn)有哪些?

網(wǎng)站首頁 關(guān)于我們 產(chǎn)品展示 新聞中心 工程案例 在線留言 聯(lián)系我們